Trillium Creek Primary School (NEW)
Sep 1, 2012 Start Date
Jun 1, 2009 100% Percent Completed
Legend:
Project Summary
Student enrollment data for the primary level indicates a need for a starter primary school in West Linn by 2012. Proposal is for an initial enrollment of 300 students and a design to add future classrooms for a total build-out capacity of 500 students.
July 2012 Trillium Creek PS email Update
June 2012 Trillium Creek PS email Update
May 2012 Trillium Creek PS email Update
April 2012 Trillium Creek PS email Update
March 2012 Trillium Creek PS email Update
January 2012 Trillium Creek PS email Update
November 2011 Trillium Creek PS email Update
October 2011 Trillium Creek PS email Update
September 2011 Trillium Creek PS email Update
September 23, 2011 Weekend Trillium Creek PS email Update
September 9, 2011 Weekend Trillium Creek PS email Update
August 2011 Trillium Creek PS email Update
July 2011 Trillium Creek PS email Update
June 2011 Trillium Creek PS email Update
May 2011 Trillium Creek PS email Update
April 2011 Trillium Creek PS email Update
Legend:
Project Tasks
- New 300-Student Primary School
-
- 10036.018 New Primary School Includes All Projects Listed Below
Scheduled Completion Date: 2012-09-01 Project Manager: Tony Vandenberg
- 10036.018 New Primary School Includes All Projects Listed Below
- 21-acre Site Development
- Covered Hard-surface Play Structure
- Focus on Sustainability
- Off-Site Street Construction
- Playfields for Baseball, Soccer, General PE & Athletics
- Primary level Playground Equipment
- Site Circulation, Parking, Separate Bus Loading
- Site Electrical and Lighting
- Site Storm-water Management
- Site Utilities including City Water/Sewer, Natural Gas, Power, Communications
- Site Wetland Development and Mitigation
- 60,000 square-foot, 2-story Primary School
- 12 Regular Education Classrooms arranged in clusters around shared use space
- Administrative and Support Spaces
- Cafeteria/Kitchen, Commons, Gymnasium, Library
- Energy Efficient Design and Product Specification
- Mechanical, Electrical, Telecommunications space
- Owner Costs
- Building Commissioning/Delivery/Start-up Costs (Turn-Key)
- Building Fire/Life/Safety and Security Systems
- Building Furniture, Fixtures and Equipment
- Building Identification and Signage
- Custodial & Maintenance Equipment
- Instructional Computers and Tech Equipment
- Library Books and Instructional Materials
- Technology Infrastructure, Hardware, Software
- Soft Costs
- Architectural & Engineering Design Fees
- Construction Management/Professional Services
- Jurisdictional Permit Fees
- Office, Printing, Insurance, Public Bidding, Advertising, Accounting, Legal Costs
-
Project Documents
Click to save or open a document
- 11-2-2009-Conceptual Drawing - West Entry
- 02-27-2009-Design Meeting Minutes
- 03-09-2009- Design Meeting Minutes
- 03-16-2009-Design Meeting Minutes
- 03-30-2009-Design Meeting Minutes
- 04-06-2009-Design Meeting Minutes
- 04-20-2009-Design Meeting Minutes
- 04-27-2009-Design Meeting Minutes
- 05-04-2009-Design Meeting Minutes
- 05-11-2009-Design Meeting Minutes
- 05-18-2009-Design Meeting Minutes
- 06-01-2009 Design Meeting Minutes
- 06-08-2009-Design Meeting Minutes
- 06-22-2009-Design Meeting Minutes
- 06-24-2009-Sustainability Forum Design Meeting Minutes
- 06-29-2009-Design Meeting Minutes
- 07-15-2009-Design Meeting Minutes
- Design Constraints & Opportunities
- Design Option A
- Design Option B
- Design Option C
- 07-28-2009-Design Meeting Minutes
- 08-19-2009-Design Meeting MInutes
- 08-10-2009-Design Meeting Minutes
- 08-24-2009-Design Meeting Minutes
- 09-28-2009-Design Meeting MInutes
- 10-26-2009-Design Meeting MInutes
- 11-16-2009-Design Meeting MInutes
- 12-07-2009 Erickson Design Meeting Minutes
- 12-15-2009 Neighborhood Association Meeting Presentation
- Trillium Creek Primary Site Plan
- 01-26-2010-Design Meeting Minutes
- 10-7-2010 Over the Fence 2 Meeting Presentation
- 5-10-2011 Construction Meeting Minutes
- 5-17-2011 Construction Meeting Minutes
- 5-24-2011 Construction Meeting Minutes
- 5-31-2011 Construction Meeting Minutes
- 6-7-2011 Construction Meeting Minutes
- 6-14-2011 Construction Meeting Minutes
- 6-21-2011 Construction Meeting Minutes
- 6-28-2011 Construction Meeting Minutes
- 7-6-2011 Construction Meeting Minutes
- 7-12-2011 Construction Meeting Minutes
- 7-19-2011 Construction Meeting Minutes
- 7-26-2011 Construction Meeting Minutes
- 8-2-2011 Construction Meeting Minutes
- 8-9-2011 Construction Meeting Minutes
- 8-16-2011 Construction Meeting Minutes
- 8-23-2011 Construction Meeting Minutes
- 8-30-2011 Construction Meeting Minutes
- 9-6-2011 Construction Meeting Minutes
- 9-13-2011 Construction Meeting Minutes
- 9-20-2011 Construction Meeting Minutes
- 9-27-2011 Construction Meeting Minutes
- 10-4-2011 Construction Meeting Minutes
- 10-11-2011 Construction Meeting Minutes
- 10-18-2011 Construction Meeting Minutes
- 10-25-2011 Construction Meeting Minutes
- 11-1-2011 Construction Meeting Minutes
- 11-8-2011 Construction Meeting Minutes
- 11-15-2011 Construction Meeting Minutes
- 11-22-2011 Construction Meeting Minutes
- 11-29-2011 Construction Meeting Minutes
- 12-6-2011 Construction Meeting Minutes
- 12-13-2011 Construction Meeting Minutes
- 12-20-2011 Construction Meeting Minutes
- 1-3-2012 Construction Meeting Minutes
- 1-10-2012 Construction Meeting Minutes
- 1-17-2012 Construction Meeting Minutes
- 1-24-2012 Construction Meeting Minutes
- 1-31-2012 Construction Meeting Notes
- 2-7-2012 Construction Meeting Minutes
- 2-14-2012 Construction Meeting Minutes
- 2-21-2012 Construction Meeting MInutes
- 2-28-2012 Construction Meeting Minutes
- 3-6-2012 Construction Meeting Minutes
- 3-13-2012 Construction Meeting Minutes
- 3-20-2012 Construction Meeting Minutes
- 3-27-2012 Construction Meeting Minutes
- 4-3-2012 Construction Meeting Minutes
- 4-10-2012 Construction Meeting Minutes
- 4-17-2012 Construction Meeting Minutes
- 4-24-2012 Construction Meeting Minutes
- 5-1-2012 Construction Meeting Minutes
- 5-8-2012 Construction Meeting Minutes
- 5-15-2012 Construction Meeting Minutes
- 5-22-2012 Construction Meeting Minutes
- 5-29-2012 Construction Meeting Minutes
- 6-12-2012 Construction Meeting Minutes
- 6-19-2012 Construction Meeting Minutes
- 6-26-2012 Construction Meeting Minutes
- 7-10-2012 Construction Meeting Minutes
- 7-17-2012 Construction Meeting Minutes
- 7-24-2012 Construction Meeting Minutes
- 7-31-2012 Construction Meeting Minutes
- 8-14-2012 Construction Meeting Minutes
- Annexation Postcard
- Annexation Postcard 2 - Gather all the FACTS
- Trillium Creek Groundbreaking Brochure
- Trillium Creek Compensatory Mitigation Plan 2-12-10
- 08-05-2009-Design Meeting MInutes
- 11-2-2009-Conceptual Drawing - Floorplan
- Neighborhood Social - July 20, 2009
- 10-15-2009-Erickson Pre-Application Conference Meeting Notes
- Public Awareness Campaign
- 01-21-2010 Final Wetlands Delineation Memo
- Wetland Delineation Report
- Trillium Creek General Mitigation Monitoring & Student Resoration Overview
- 11-18-2010 West Linn Tidings Article - Goats and Sustainability Trillium Creek
- 11-2-2009-Conceptual Drawing - Gym
- 11-2-2009-Conceptual Drawing - Library
- 11-2-2009-Conceptual Drawing - Library Plan
- 10-7-2010 Site Landscape Design
- Playground Design
- 01-07-2010 Portland Tribune Sustainability Article
- 10-28-2010 West Linn Tidings article: Low Impact planned for new primary school
- Trillium Creek Groundbreaking Invitation
- 5-30-2012 Wetlands Letter
- 5/24/2012 Trillium Creek Article - West Linn Tidings
Site Photos
View Trillium Creek Primary School Website
Email Project Manager